1. Ordinary exterior wall installation
2. External wall installation of glass curtain wall
3. Glass curtain wall interior wall installation
4. Vertical installation on the roof
5. Column installation
6. Ceiling Mount
2. Confirmation of outdoor LED grid screen structure: For the grid screen installed on the wall of the building, in the early design of the structural construction drawings, the structure type, size and location of the building and its roots should be explained in detail, and It is analyzed and confirmed to ensure its good operating performance.
3. Key points of installation and construction of grid LED display: During construction, you should keep in touch with the construction unit at any time, keep abreast of the progress of grid screen installation, and try your best to visit the construction site, so as to avoid problems and adjustments in time when the construction is different from the plan , to ensure that the outdoor grid LED display can be successfully installed.
● Make sure that the installation structure for installing the screen can bear at least 5 times the total weight of the screen, installation accessories, wires, etc.
● Make sure that there are no objects that are easy to fall above the installation position of the screen, so as to avoid damage to the screen and cause casualties.
● Make sure that there are no pedestrians and vehicles passing by at the bottom of the screen, and properly restrict the movement area and provide instructions for dredging.
● During installation, follow the normal operating procedures and wear safety helmets and other related measures.