An LED ribbon board is a long, shallow display mounted along the front edge of a seating tier. Arenas use it for sponsor graphics, scores, prompts and coordinated effects around the bowl. To specify one, start with the fascia drawing, the seats it must serve and the content it needs to show. Those three inputs determine the screen geometry, the useful pixel height and the playback zones suppliers need to quote.
If you are preparing an arena bid, ask every supplier to show how the display fits the same building and runs the same content. A good proposal gives you a segment drawing, a native pixel map, an itemized scope and a way to test the finished system. The examples below show what to request and what to approve before cabinets go into production.

1. Define the display’s job
01. Assign a role to each display
Write down what fans should see on the LED ribbon board while the main board is showing a replay, during a sponsor break and before the teams enter. Repeated scores or short messages can work well along the seating tiers. Replays and detailed statistics usually need the height of a main video board. If the production team plans to show sponsor logos alongside live scores, give each element space in a sample layout so the bidder can test both at actual pixel size.
| Display | Typical assignment | Design implication |
|---|---|---|
| Fascia ribbon | Repeated sponsor marks, short prompts, score lines and venue-wide effects | Allocate enough vertical pixels for the smallest required logo or line of text. |
| Center-hung or end-wall video board | Replays, live camera feeds, detailed score or player graphics | Confirm the viewing angles of each face and preserve room for readable score graphics. |
| Field-level perimeter board | Advertising along the playing boundary, often within camera shots | Check the view from broadcast positions and the venue’s requirements for player proximity. |
| Concourse display | Directions, schedules or information for people away from their seats | Design for visitors approaching on foot and for the time they have to read the message. |

02. Decide where a continuous run adds value
A continuous LED ribbon board can carry coordinated graphics around the bowl. Separate runs may suit tiers interrupted by entrances, stairs or suites. Ask the show producer which effects must appear continuous and which messages can repeat on each run. A sectional layout can still run a coordinated show if the playback system can trigger all sections together. Review the stadium LED display solutions to place the fascia screen in the venue’s wider display plan.
Mark any seating sections that should see the same announcement at the same time. For example, seats on opposite sides may each have a clear view of a different part of the ribbon. Give those sections their own copy of the message on the canvas. If a suite or entry opening splits the longer run, place one complete copy on each visible side where the layout permits.
2. Survey the fascia and select the pixel pitch
01. Measure each usable run
Mark the start and end of every LED ribbon board run on the elevation. Record the available height, changes in level, curve radii, corner angles and openings that must remain clear. Where the tier curves, ask the supplier to show cabinet joints and the proposed face of the display in plan view. The straight-line distance between two endpoints can differ from the length along the face. On a renovation, have the survey team check the existing structure against the record drawings before the fabricator commits to cabinet sizes.
02. Test pixel pitch against the content
Pixel pitch is the center-to-center distance between pixels. For a given active height, a smaller pitch gives an LED ribbon board more rows on which to draw letters and logos. Ask bidders to show the smallest required score, sponsor mark and line of text at native resolution. Evaluate the material from the nearest priority seats, the farthest seats expected to read it and the steepest side angles. Take a position beneath the tier as well. The fascia above those seats may be partly out of view even when the pixels are easy to read from across the bowl.

Check the image with the arena in its normal event lighting and in any dimmed show mode. An LED ribbon board next to a bright opening or in an outdoor venue also needs review under the expected daylight. Specify the operating conditions and ask how brightness will be set or limited from event to event. Request a camera test if the display sits in common broadcast shots. Agree on representative camera positions, exposure settings, the brightness range and the graphics to test.
3. Map the content canvas and playback zones
01. Estimate the LED ribbon board canvas
Divide the active width and height in millimeters by the nominal pitch to estimate the canvas. For example, assume a straight 24 m × 0.6 m active run (about 79 ft × 24 in) at a uniform 5 mm pitch. That gives an estimated 4,800 × 120 pixels. At 4 mm, the same theoretical area gives 6,000 × 150 pixels. The second option has 30 more rows for the designer, and its total pixel count is higher. Verify how the proposed cabinets tile and how the processor maps that width before relying on either estimate.
Ask for the final LED ribbon board map by cabinet and segment, with pixel coordinates, corner locations and blank gaps. Give that map to the creative team before it builds sponsor graphics. The map should identify where a logo can sit intact, where scrolling text has to restart and which pixels belong to parts of the display controlled separately. For the same run, the physical shop drawing and the pixel map serve different teams. Both should carry matching segment identifiers.
Consider two display segments separated by a vomitory, the passage where spectators enter the seating bowl. If the design calls for a graphic to travel across that gap, the editor and operator need to know whether the map reserves blank pixels for the opening or treats each segment as a separate canvas. Those choices produce different motion timing at the transition. Ask the supplier to provide a preview using the actual gap and have the show producer approve how the animation resumes.
02. Specify what the operator can trigger
Decide whether the LED ribbon board should play one graphic across the venue, repeat it by segment or switch sections independently. A sponsor takeover could use all runs at once, while a scoreboard message might repeat near opposite ends. If the operator will trigger the ribbon from the main show system, define which cues need to start together and what remains visible if the input drops. A saved venue graphic or a deliberate blank are possible fallback choices. Have the venue approve one for each source and event mode.
A very wide LED ribbon board canvas may be split across processor outputs. Have each bidder submit the input format, output and port assignments, proposed loads and the method used to keep neighboring runs in sync. Ask for a sample content template at the native pixel dimensions. The creative team can use this to see whether the system needs one master file, several files or separate playlists for different types of show cue.
4. Plan service access, power and signal paths
01. Review access with the structure
The fascia for an LED ribbon board needs a project-specific support design. Ask the vendor for cabinet weights, mounting points and service clearances, then have the responsible structural professional review the support and attachment conditions. Include any additional support steel and relevant outdoor loads in that review. The arena team should also check that the layout preserves circulation, required clearances and access to adjacent building systems.
Choose front or rear service by walking the proposed maintenance route. For rear service, trace the route from entry to cabinet and allow room to open doors and remove a component. For front service, check how technicians reach modules above the seating, what access equipment they need and whether maintenance can take place between events. Ask the supplier to demonstrate a module or power-supply replacement on the proposed cabinet before you approve the service plan.

02. Budget power and signal by segment
For each LED ribbon board run, ask for maximum electrical demand and a separate estimate of typical consumption, with the brightness and content assumptions stated. Have the electrical designer use the appropriate load data for circuits and distribution. Ask who supplies the distribution equipment, the final connection and any local disconnects. For outdoor exposure, document where rain, wind or condensation can reach the display and check the proposed protection at the front, rear and cable entries.
Map how the signal reaches each segment from the control room. Long routes may require fiber, so have the AV designer confirm the cable type, endpoints and responsibility for testing. Ask what portion of the LED ribbon board goes dark if a processor output or cable fails. If the venue requires a backup path, name the failure it should cover and request a demonstration. A redundant path can protect against one class of failure while leaving other single points in the system.

5. Compare bids on the same scope
Ask each supplier to quote the same runs, active heights, show functions and acceptance tests. The largest differences in an LED ribbon board bid can come from custom corners, support work, long signal routes, access equipment, control integration and commissioning. A square-meter price makes those items difficult to compare. Request a base scope with a separate price and drawing for each option. Use the LED display RFP checklist for general bid fields and add the fascia-specific items below.
| Bid item | Supplier deliverable | What to compare |
|---|---|---|
| Fascia geometry | Dimensioned elevation and plan with run IDs, active dimensions, edge trim and cabinet joints | Whether breaks and corner treatments preserve the planned coverage |
| Image and playback | Native pixel map, sample sponsor layout and processor output schedule | How many usable pixel rows the content gets and who supplies templates or show integration |
| Building interface | Weight, mounting details, service envelope and a list of works by others | Who carries the support, access equipment, electrical feeds and finish repairs |
| Operation and spares | Operator training scope, itemized spares, warranty terms and replacement procedure | What the venue can replace on site and who supplies labor and parts afterward |
| Testing and handover | Factory and site test plans, acceptance criteria and list of files to turn over | Which tasks are witnessed, who signs off and how corrective work is handled |
Keep a separate list of open assumptions for the LED ribbon board. If an existing fascia needs reinforcement, identify the party who will survey it and the date when the result must reach the vendor. If the club is changing its scoring system, name the equipment or interface that will feed the ribbon. Ask bidders to identify any allowance for these unknowns so you can compare proposals before committing to a design.
Try a bid comparison before the final quote round. Suppose one proposal increases the active height and another changes only the pixel pitch. Put the same sponsor graphic and score line on each proposed pixel map. The pitch change affects how many pixels represent each element. The height change can also alter each element’s on-screen size and the clearances around the ribbon. Ask for a marked-up elevation and a sample frame for each option so the venue can judge both effects.
6. Test the system before handover
01. Review a section before production or shipment
Plan a factory review of a representative LED ribbon board section where practical. Include a cabinet joint and, if the project uses custom angles, a representative corner. Run flat red, green, blue, white and gray fields to expose color or brightness differences. Then play a real sponsor file, a short score line and a moving graphic at the agreed resolution. Record the sample configuration and the clips used so the venue can repeat the check after installation.
02. Reproduce event conditions in the bowl
Walk the agreed seats while the installed LED ribbon board runs event content. Check legibility, whether logos cross cabinet gaps or physical breaks, and whether motion across neighboring runs starts as intended. Have the operator try simultaneous playback, separate zones and the agreed loss-of-input behavior. Where cameras are part of the specification, repeat the representative shots and review the recorded footage. See the LED video wall acceptance checklist for additional commissioning checks.
Record results by run ID. For each check, include the cue, viewing or camera position, lighting preset and observed issue. Agree before testing on the conditions that warrant a retest. A useful record might show that a sponsor logo was clipped at a specific opening under a named cue and that the corrected file was accepted from the same seats. The producer can then distinguish a content correction from a cabinet alignment or playback issue. Save the accepted version of the clip with the handover files.
Close out with the as-built drawings, processor configuration backups, labeled pixel maps, approved artwork templates and the list of fitted and spare components. Have a venue operator use those materials to run one show cue and recover from a planned signal interruption. That demonstration confirms the people running the arena have the files, credentials and instructions they need for the next event.
Frequently asked questions
01. Can an LED ribbon board reuse the existing fascia mounting system?
Reuse depends on the condition, capacity and geometry of the existing support. Get a survey and a structural review before assuming the old attachment points will work. Give bidders the same findings so any reinforcement or replacement work appears in comparable proposals.
02. Can different sponsors run on different sides of the arena?
Yes, if the playback and control design supports independent zones. Define the zone boundaries, who is allowed to schedule them and how a venue-wide cue overrides local playlists. Ask bidders to demonstrate the changeover.
03. Can the ribbon show live scores from the venue scoreboard?
It can when the scoring source and the playback system have a supported interface. Identify the specific source, the fields the ribbon should show and what the audience sees if updates stop. Use the actual scoring feed during site acceptance.
04. How should I order spares for a custom section?
Ask for a spares list by cabinet type and coordinate, including any modules or trims specific to turns and end sections. Request the steps and files needed to match a replacement module to neighboring modules after it is fitted.
05. Can the work be phased around the arena calendar?
Ask bidders to assign each run to an installation window and identify when a lift, blocked seating or a control-system outage is required. If parts of the existing display must stay live, include a temporary operations plan and test each completed phase before spectators return.
Get a quote based on your fascia drawings
Collect a fascia elevation, a seating plan, the nearest and farthest priority viewing positions, and one sample of the content you intend to run. Include known openings, curves, service routes, the lighting environment and any scoring or show-control systems the display must connect to. Send your LED ribbon board project brief to EagerLED and ask for a proposed segment layout, native pixel dimensions and an itemized quote.